Re: Greg Jackson
Paywall removed version.
https://archive.ph/D9jod#selection-2701.0-2701.156
“There’s a solar farm we want to build in County Durham and we won’t get a grid connection until 2037. That’s 13 years where that capital can’t be deployed."
https://archive.ph/D9jod#selection-2701.0-2701.156
“There’s a solar farm we want to build in County Durham and we won’t get a grid connection until 2037. That’s 13 years where that capital can’t be deployed."
18.7kW PV > 111MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
-
- Posts: 662
- Joined: Mon Mar 21, 2022 7:37 pm
Re: Greg Jackson
Thanks JB, and Nowty for the getaround, I found that article interesting on lots of counts.
I have lost the article about his desire to install a private grid connection but I suppose that follows from his investment in the company wanting to build a Morocco to England HVDC link which seems daft to me but then I never did good in business.
The chap that led our borough council into bankruptcy was a RE pioneer (his deputy got the MBE though) and he ran a private wire and heat main to buildings in the town, CHP using fossil fuels though.
I have lost the article about his desire to install a private grid connection but I suppose that follows from his investment in the company wanting to build a Morocco to England HVDC link which seems daft to me but then I never did good in business.
The chap that led our borough council into bankruptcy was a RE pioneer (his deputy got the MBE though) and he ran a private wire and heat main to buildings in the town, CHP using fossil fuels though.
Morso S11
FIT
4kW panels facing WSW
Solarmax 4200S
Non FIT
disparate string
1.75kW facing SSE
0.85kW facing NE
2.6kW facing WSW
Sunsynk 3.6kW inverter
Storage
10.4kWh GLS lithium phosphate battery
FIT
4kW panels facing WSW
Solarmax 4200S
Non FIT
disparate string
1.75kW facing SSE
0.85kW facing NE
2.6kW facing WSW
Sunsynk 3.6kW inverter
Storage
10.4kWh GLS lithium phosphate battery