Part ownership of a Ripple Wind Turbine, fancy it?

Wind turbines
User avatar
nowty
Posts: 6411
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1421

Post by nowty »

Joeboy wrote: Mon Jul 04, 2022 7:36 pm
nowty wrote: Mon Jul 04, 2022 6:33 pm
Joeboy wrote: Mon Jul 04, 2022 6:23 pm Anyone else get 'the offer' today?
Yes, but I’m already at 120%. :evil:
Lie accordingly. :twisted:
I already had, with Kirk Hill I'm officially only 120% but I'm actually round 180%. ;)

My fathers @ 200%, but he's officially only at 77%, I think I'll sign him up for a few more. :twisted:
18.7kW PV > 111MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
User avatar
Joeboy
Posts: 9130
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1422

Post by Joeboy »

nowty wrote: Mon Jul 04, 2022 9:33 pm
Joeboy wrote: Mon Jul 04, 2022 7:36 pm
nowty wrote: Mon Jul 04, 2022 6:33 pm

Yes, but I’m already at 120%. :evil:
Lie accordingly. :twisted:
I already had, with Kirk Hill I'm officially only 120% but I'm actually round 180%. ;)

My fathers @ 200%, but he's officially only at 77%, I think I'll sign him up for a few more. :twisted:
You are well sorted then. I'll have to line up a whopper for Proj 3.
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
TCA
Posts: 48
Joined: Fri Jan 14, 2022 7:11 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1423

Post by TCA »

Joeboy wrote: Mon Jul 04, 2022 6:23 pm Anyone else get 'the offer' today?
Are they trying to flog more kW in order to reduce the bank funding?
Mr Gus
Posts: 3813
Joined: Sun Jun 13, 2021 9:42 pm
Location: Tofu eaters paradise (harrumph)

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1424

Post by Mr Gus »

I cannot access my emails currently & am keen to know what's happening, logged into my ripple account & would have thought any messages would duplicate there, ..nope.
What is happening?
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
John_S
Posts: 443
Joined: Wed Jun 02, 2021 10:03 am
Location: West London

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1425

Post by John_S »

Ripple are inviting us to join the waiting list to buy WT1 shares. Looks as if they must have people wanting to sell. Includes warning about not exceeding 120%.

Nothing about the 2 year moratorium on sales in the offer document.
User avatar
Joeboy
Posts: 9130
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1426

Post by Joeboy »

TCA wrote: Mon Jul 04, 2022 11:00 pm
Joeboy wrote: Mon Jul 04, 2022 6:23 pm Anyone else get 'the offer' today?
Are they trying to flog more kW in order to reduce the bank funding?
Thinking this too.
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
AE-NMidlands
Posts: 2270
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1427

Post by AE-NMidlands »

I haven't seen that either. Maybe something to do with whether we are currently signed up or in others stages, or already at 120%?
I would like to up my phase 2 investment, as I suspect that might be the sweet spot: onshore, well-established technology, likely to give a better return than phase 1.. How well is part 3 going to turn out? The risks look a lot greater to me.
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh Givenergy batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
Joeboy
Posts: 9130
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1428

Post by Joeboy »

AE-NMidlands wrote: Tue Jul 05, 2022 8:07 am I haven't seen that either. Maybe something to do with whether we are currently signed up or in others stages, or already at 120%?
I would like to up my phase 2 investment, as I suspect that might be the sweet spot: onshore, well-established technology, likely to give a better return than phase 1.. How well is part 3 going to turn out? The risks look a lot greater to me.
A
You should be in there AE as it's current GF investors. I received a mail to my Hotmail account not via Ripple dashboard?
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
AE-NMidlands
Posts: 2270
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1429

Post by AE-NMidlands »

Joeboy wrote: Tue Jul 05, 2022 8:20 am
AE-NMidlands wrote: Tue Jul 05, 2022 8:07 am I haven't seen that either. Maybe something to do with whether we are currently signed up or in others stages, or already at 120%?
I would like to up my phase 2 investment, as I suspect that might be the sweet spot: onshore, well-established technology, likely to give a better return than phase 1.. How well is part 3 going to turn out? The risks look a lot greater to me.
A
You should be in there AE as it's current GF investors. I received a mail to my Hotmail account not via Ripple dashboard?
I had got it, found it when I went digging. Thanks Joe.
I missed it amongst loads off other stuff - and coincidentally the confirmation of my reservation in phase 3 the same day.
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh Givenergy batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
Joeboy
Posts: 9130
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1430

Post by Joeboy »

AE-NMidlands wrote: Tue Jul 05, 2022 8:36 am
Joeboy wrote: Tue Jul 05, 2022 8:20 am
AE-NMidlands wrote: Tue Jul 05, 2022 8:07 am I haven't seen that either. Maybe something to do with whether we are currently signed up or in others stages, or already at 120%?
I would like to up my phase 2 investment, as I suspect that might be the sweet spot: onshore, well-established technology, likely to give a better return than phase 1.. How well is part 3 going to turn out? The risks look a lot greater to me.
A
You should be in there AE as it's current GF investors. I received a mail to my Hotmail account not via Ripple dashboard?
I had got it, found it when I went digging. Thanks Joe.
I missed it amongst loads off other stuff - and coincidentally the confirmation of my reservation in phase 3 the same day.
A
Good to hear! Starting track work this month then at KH? Should hopefully hear about Project 3 soon?
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
Post Reply