https://www.nationalgrid.com/lakeside-f ... ed-battery
A 100MW/200MWh grid-scale battery connected and energised on the grid near Drax. Nice.
UK's largest (so far) BESS connected
UK's largest (so far) BESS connected
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: UK's largest (so far) BESS connected
It actually doesn't look very big at all and easy to miss as you drive pass. They are still working their.
Next to it they are now doing the prep for the new converter station for the cable from Scotland.
Next to it they are now doing the prep for the new converter station for the cable from Scotland.
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 135kWh Rolls batteries, 52kWh Growatt storage GBLI 6532, 66kWh Pylontech US3000C, 43kWh DIY, Sofar ME3000's, Brosley wood burner and 250lt DHW