EDF submits its proposals for 4x EPR1200s for the Czech power sector.
These would be "Version 2s" of the EPR design being built at HPC - lower output but apparently much simpler and cheaper to build.

https://www.edf.fr/en/the-edf-group/ded ... h-republic
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
dan_b
Posts: 1869
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#52

Post by dan_b »

Couple of posts on Twitter saying that EDF is going to start fuel loading today (2nd May).
Moxi wrote: Tue Mar 05, 2024 9:15 am
Flamanville unit 3 should be being fuelled up at the moment and hot commission mid 2024, original price 3.1 billion, current estimated out turn costs 13.5 to 19.4 billion depending on what you read and where, so maybe the 22.46 billion is realistic ?

Moxi
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Ken
Posts: 431
Joined: Mon Jul 26, 2021 10:07 am

Re: HPC

#53

Post by Ken »

no doubt someone has picked up on this.

"In January 2024, EDF announced that it estimated that the final cost could rise up to £46 billion in 2024 prices and be delayed by up to three years."

£46B and we still want to build more !
dan_b
Posts: 1869
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#54

Post by dan_b »

EDF receives regulatory approval to start fuel loading at Flamanville 3. How long does it take? I guess an abundance of caution for the first load-up?

https://www.asn.fr/l-asn-informe/actual ... lamanville
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Moxi
Posts: 1781
Joined: Sun Oct 31, 2021 3:46 pm

Re: HPC

#55

Post by Moxi »

dan_b wrote: Wed May 08, 2024 10:38 am EDF receives regulatory approval to start fuel loading at Flamanville 3. How long does it take? I guess an abundance of caution for the first load-up?

https://www.asn.fr/l-asn-informe/actual ... lamanville
About a month to load the 241 fuel assemblies.
dan_b
Posts: 1869
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#56

Post by dan_b »

Wow that long? So they might start actual power generation by when, July perhaps?